Mined Land Reclamation 7 October 13, 1992
<br />TABLE I CONT'D
<br />STATION U8
<br />August, 1985 Not tied in this survey
<br />July, 1986 402,237.66 1,441,721.25 7265.90
<br />November, 1986 402,237.61 1,441,721.25 7265.94
<br />July, 1987 402,237.72 1,441,721.22 7265.89
<br />October, 1987 402,237.76 1,441,721.30 7265.82
<br />June, 1988 402,237.84 1,441,721.45 7265.87
<br />November, 1988 402,237.83 1,441,721.42 7265.75
<br />July, 1989 402,237.98 1,441,721.44 7265.74
<br />November, 1989 402,237.93 1,441,721.48 7265.66
<br />July, 1990 402,237.98 1,441,721.72 7265.70
<br />November, 1990 402,237.98 1,441,721.50 7265.58
<br />July, 1991 402,238.13 1,441,721.54 7265.61
<br />November, 1991 402,238.04 1,441,721.53 7265.52
<br />July, 1992 402,238.10 1,441,721.49 7265.54
<br />MEAN 402,237.88 1,441,721.43 7265.72
<br />POINTS NOT OCCUPIED
<br />NOTE - Stations U10, U11, U21, U22 are 2-inch diameter pipe, 8
<br />feet tall, set in the ground with a single prism attached to the
<br />top of the pole - Values given are for the prism at the top of
<br />the pole.
<br />STATION U10
<br />August, 1985 Not tied in this Survey
<br />July, 1986 402,421.13 1,440,865.09 6682.56
<br />November, 1986 402,421.32 1,440,865.23 6682.41
<br />July, 1987 402,421.42 1,440,865.42 6682.43
<br />October, 1987 402,421.52 1,440,865.48 6682.52
<br />June, 1988 402,421.56 1,440,865.48 6682.37
<br />November, 1988 402,421.62 1,440,865.50 6682.38
<br />July, 1989 402,421.71 1,440,865.56 6682.27
<br />November, 1989 402,421.74 1,440,865.60 6682.34
<br />July, 1990 402,421.82 1,440,865.67 6682.26
<br />November, 1990 402,421.95 1,440,865.33 6682.30
<br />July, 1991 402,422.13 1,440,865.40 6682.18
<br />November, 1991 402,422.16 1,440,865.34 6682.16
<br />July, 1992 402,422.24 1,440,865.35 6682.14
<br />MEAN 402,421.71 1,440,865.41 6682.32
<br />
|