Mined Land Reclamation 8 October 13, 1992
<br />TABLE I CONT'D
<br />STATION Ull
<br />August, 1985
<br />July, 1986
<br />November, 1986
<br />July, 1987
<br />October, 1987
<br />June, 1988
<br />November, 1988
<br />July, 1989
<br />November, 1989
<br />July, 1990
<br />November, 1990
<br />July, 1991
<br />November, 1991
<br />July, 1992
<br />Mean
<br />Not tied in this Survey
<br />401,405.76 1,440,865.24 7335.14
<br />401,407.06 1,440,865.20 7334.60 2
<br />401,405.85 1,440,865.20 7335.21
<br />401,405.81 1,440,865.28 7335.14
<br />401,405.91 1,440,865.46 7335.04
<br />401,405.93 1,440,865.31 7334.95
<br />401,405.97 1,440,865.36 7334.85
<br />401,405.97 1,440,865.37 7334.70
<br />401,406.04 1,440,865.64 7334.63
<br />401,406.10 1,440,865.34 7334.58
<br />401,406.28 1,440,865.30 7334.48
<br />401,406.53 1,440,864.91 7334.36
<br />401,407.69 1,440,863.88 7334.09
<br />401,406.14 1,440,865.21 7334.77 3
<br />UTE resumed monitoring Stations U21 and U22 in May of 1992.
<br />Refer to UTE's report dated May 6, 1992. This report and future
<br />reports will show the values for U21 and U22 from the May, 1992
<br />survey to the current survey.
<br />STATION U21
<br />May, 1992 402,200.63 1,439,433.61 6683.73
<br />July, 1992 402,200.52 1,439,433.66 6683.84
<br />Mean 402,200.58 1,439,433.64 6683.78
<br />STATION U22
<br />May, 1992 401,689.51 1,439,425.06 6994.19
<br />July, 1992 401,689.45 1,439,425.24 6994.34
<br />Mean 401,689.48 1,439,425.15 6994.26
<br />Slope Stability Stations at Bear #3 Are Tied to D-11-U and D-12-U
<br />through a series of primary loops:
<br />Bear #3 U 16
<br />U 17
<br />U 18
<br />U 19 4
<br />U 23 5
<br />2Tied by triangulation-No distances
<br />3Mean does not include November, 1986
<br />4Monument = #5 Rebar
<br />SMonument = #7 Rebar in concrete
<br />
|