Laserfiche WebLink
Mined Land Reclamation 8 October 13, 1992 <br />TABLE I CONT'D <br />STATION Ull <br />August, 1985 <br />July, 1986 <br />November, 1986 <br />July, 1987 <br />October, 1987 <br />June, 1988 <br />November, 1988 <br />July, 1989 <br />November, 1989 <br />July, 1990 <br />November, 1990 <br />July, 1991 <br />November, 1991 <br />July, 1992 <br />Mean <br />Not tied in this Survey <br />401,405.76 1,440,865.24 7335.14 <br />401,407.06 1,440,865.20 7334.60 2 <br />401,405.85 1,440,865.20 7335.21 <br />401,405.81 1,440,865.28 7335.14 <br />401,405.91 1,440,865.46 7335.04 <br />401,405.93 1,440,865.31 7334.95 <br />401,405.97 1,440,865.36 7334.85 <br />401,405.97 1,440,865.37 7334.70 <br />401,406.04 1,440,865.64 7334.63 <br />401,406.10 1,440,865.34 7334.58 <br />401,406.28 1,440,865.30 7334.48 <br />401,406.53 1,440,864.91 7334.36 <br />401,407.69 1,440,863.88 7334.09 <br />401,406.14 1,440,865.21 7334.77 3 <br />UTE resumed monitoring Stations U21 and U22 in May of 1992. <br />Refer to UTE's report dated May 6, 1992. This report and future <br />reports will show the values for U21 and U22 from the May, 1992 <br />survey to the current survey. <br />STATION U21 <br />May, 1992 402,200.63 1,439,433.61 6683.73 <br />July, 1992 402,200.52 1,439,433.66 6683.84 <br />Mean 402,200.58 1,439,433.64 6683.78 <br />STATION U22 <br />May, 1992 401,689.51 1,439,425.06 6994.19 <br />July, 1992 401,689.45 1,439,425.24 6994.34 <br />Mean 401,689.48 1,439,425.15 6994.26 <br />Slope Stability Stations at Bear #3 Are Tied to D-11-U and D-12-U <br />through a series of primary loops: <br />Bear #3 U 16 <br />U 17 <br />U 18 <br />U 19 4 <br />U 23 5 <br />2Tied by triangulation-No distances <br />3Mean does not include November, 1986 <br />4Monument = #5 Rebar <br />SMonument = #7 Rebar in concrete <br />