My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP48147
DRMS
>
Back File Migration
>
Report
>
REP48147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:52:00 AM
Creation date
11/27/2007 12:14:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Report
Doc Date
3/15/1990
Doc Name
A STUDY PLAN FOR REFUSE PILE REVEG - REVISED
From
WESTERN FUELS UTAH INC
To
MLRD
Permit Index Doc Type
REVEG MONITORING REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
three covers will have at least 18-inches oP topsoil; tha remaining <br />cover will consist of subsoil. The topsoil/subsoil thickness mix may <br />vary sa a result of the physical and chemical analysis oP the refuse, <br />topsoil and subsoil ae outlined in the pre-reclamation investigation <br />phase. The test plots will be constructed in Spring/Summer, 1990 <br />concurrently with the reclamation of the refuse pile RP-1. <br />o The test plots will be mulched with grass hay or straw, and seeded <br />with a rangeland seed drill to form a crimped hay mulch. <br />Post-reclamation Investiptation <br />The post-reclamation investigation will consist oP the following tasks: <br />0 <br /> <br />r ~~ <br />~-5-'. <br />~/ <br />J <br />The vegetation on the teat plots will be sampled beginning in the <br />summer oP 1991. Sampling will be repeated in the summer of 1992, <br />1993 and 1995. Cover and woody density sampling will be performed <br />in 1991 and 1992. Cover, woody density and production sampling will <br />be conducted in 1993 and 1995. <br />Cover sampling within plots will entail 5-10 systematically or~ <br />randomly located 100' transacts with 5 systematically or randomly <br />spaced 10 point frame placements per transact. Woody density data }J <br />n~ <br />will be estimated Prom 2 meter wide belt transecte run along each ~ <br />cover tranaect. For production sampling, a minimum of 10 randomly <br />b`=-~" <br />located Imp quadrats per plot will be used. Sample adequacy will be Z <br />set such that estimates are within 10% oP the true mean at the 90% <br />level of statistical confidence. <br />o Rooting depth oP the major species within the various plots will be <br />evaluated. A number of soil pits will be dug within each plot in the <br />final year of the study and results of the evaluation will be included <br />in the final report. <br />o ~ The plant sample will be analyzed Por selenium and boron content if <br />the pre-reclamation investigation shows a high concentration oP <br />
The URL can be used to link to this page
Your browser does not support the video tag.