Laserfiche WebLink
<br />Henderson Mine, Permit p' M-77-342 <br />Site Specific Reclamation Costs <br />Page 2 <br />7. Horseshoe Intake Shores (2 acres) <br />a) Fertilize 2 acres at $150/acre, <br />(1 application) ~ 0 <br />Total... $ 0 <br />8. Ute Creek Reservoir Shores (12 acres) <br />a) Fertilize 12 acres at $150/acre, <br /> (1 application) ~_~ <br /> Total... $ 2 <br />9. Tailing Deposition Area (2,464 acres) <br />a) Revegetate tailing, 840 acres at <br /> $4968/acre $ 4173 <br />b) Flood Control 400 <br />c) Revegetate perimeter road, trees and <br /> shrubs only, 94 acres at $429/acre 40 <br />d) Permanent use, Bypass Canal/Road, <br /> 40 acres 0 <br />e) Buffer, 1,530 acres 0 <br />Total... $ 4613 <br />10. Gravel Pit and Storage (54 acres) <br />a) Grading and site preparation $ 14 <br />b) Revegetate 35 acres at $1526/acre 53 <br />c) Buffer, 19 acres 0 <br />Total... $ 67 <br />11. RR Gravel Pit (5 acres) <br />a) Grading and site preparation $ 3 <br />b) Revegetate 5 acres at $1526/acre ~ <br />Total... $ 11 <br />12. Contractor's Camp and Storage (9 acres) <br />a) Fertilize 9 acres at $150/acre ~ <br />Total... $ 1 <br />13. Borrow Area (4 acres) <br />a) Revegetate 3 acres at $1526/acre $ 5 <br />b) Fertilize 1 acre,(1 application) 0 <br />Total... $ 5 <br />14. Power line/Refuse Area (17 acres) <br />a) Dismantle <br />b) Grading and site preparation <br />c) Revegetate road bed, 3 acres at <br />$1526/acre <br />d) Fertilize slopes, 14 acres at $150/acre, <br />(1 application) <br />Total... <br />$ 0 <br />9 <br />5 <br />2 <br />$ 16 <br />