Laserfiche WebLink
<br />Henderson Mine, Permit ~ M-77-342 <br />Site Specific Reclamation Costs <br />Page 3 <br />15. Makeup Water Line/Pump house (8 acres) <br />a) Dismantle $ 0 <br />b) Grading and site preparation 2 <br />c) Revegetate pump house, 1 acre at $1526/acre 2 <br />d) Fertilize 7 acres at $150/acre, (1 <br />application) 1 <br />Total... $ 5 <br />16. Tailing Line/Power line (47 acres) <br />a) Dismantle $ 0 <br />b) Grading and site preparation 8 <br />c) Revegetate 5 acres at $1526/acre 8 <br />d) Fertilize slopes, 27 acres at $150/acre, <br />(1 application) 4 <br />e) Buffer, 15 acres _~ <br />Total... $ 20 <br />17. East Branch Flood Bypass (5 acres) <br />a) Fertilize 5 acres at $150/acre ~_~ <br />Total... $ 1 <br />18. Tailing Building/Road (45 acres) <br />a) Revegetate 6 acres at $1526/acre $ 9 <br />b) Grading and site preparation 8 <br />c) Buffer, 39 acres 0 <br />Total... $ 17 <br />19. Mill Water Return Line/Power line (31 acres) <br />a) Revegetate road, 8 acres at $1526/acre $ 12 <br />b) Grading and site preparation 5 <br />c) Fertilize slopes, 16 acres at $150/acre, <br />(1 application) 2 <br />d) Buffer, 7 acres 0 <br />Total... $ 19 <br />20. Seepwater Canal/Pump house (52 acres) <br />a) Dismantle $ 0 <br />b) Grading and site preparation 8 <br />c) Revegetate road, etc., 8 acres at <br />$1526/acre 12 <br />d) Fertilize 41 acres at $150/acre,(1 <br />application) 6 <br />e) Buffer, 3 acres O <br />Total... $ 26 <br />21. Topsoil Stockpiles/Roads (190 acres) <br />a) Revegetate 44 acres at $1526/acre $ 67 <br />b) Buffer, 146 acres 0 <br />Total... $ 67 <br />