Laserfiche WebLink
<br /> <br />B. Site Specific Reclamation Costs (thousands of $) <br />The following are estimated costs of complei:ing the <br />reclamation of each specific site. Area numbers are correlated to <br />the map. Costs are 1990 dollars. Acreages are projecte<i through <br />1992. Areas partially revegetated are itemized and assigned <br />appropriate costs to complete the reclamation from thca present <br />state of progress. As in the past, "buffer" represents land <br />reserved for future possible disturbance. <br />1. Mine Site (172 Acres) <br />a) Dismantle $ 0 <br />b) Grading and Site Preparation 170 <br />c) Revegetate 116 acres at $2232/acre 259 <br />d) Buffer, 56 acres 0 <br />Total... $ 429 <br />2. Vent Shaft (1 acre) <br />a) Secure shaft opening $ 50 <br />b) Fertilize 1 acre (1 application) 0 <br /> Total... $ 50 <br />3. Portal Area (28 Acres) <br />a) Dismantle, close portal $ 35 <br />b) Revegetate 3 acres at $1526/acre 5 <br />c) Fertilize 25 acres at $150/acre <br /> (1 application) 4 <br /> Total... $ 44 <br />4. Surface Railroad (121 acres) <br />a) Dismantle $ 5 <br />b) Grading and site preparation 63 <br />c) Revegetate RR bed, 36 acres at <br />$1526/acre 55 <br />d) Fertilize slopes, 73 acres at $150/acre, <br />(1 application) 11 <br />e) Buffer, 12 acres 0 <br />Total... $ 134 <br />5. Mill Yard and Access Roads (123 acres) <br />a) Dismantle $ 0 <br />b) Grading and site preparation 127 <br />c) Revegetate yard, 95 acres at $1526/acre 145 <br />d) Buffer, 28 acres 0 <br />Total... $ 272 <br />6. East Branch Reservoir Shores (100 acres) <br />a) Dismantle $ 0 <br />b) Revegetate 4 acres at $1526/acre 6 <br />c) Fertilize shores, 41 acres at <br />$150/acre,(1 application) 6 <br />d) Buffer, 55 acres 0 <br />Total... $ 12 <br />