Laserfiche WebLink
<br />Henderson Mine, Permit ~ M77-342 <br />Reclamation Costs <br />Page 2 <br />2. Cost per acre of areas with a subsoil growth medium such <br />as the portal area, reservoir shores, power lines, etc. <br /> Labor/ <br />Ha n-Days Sauioaent Material Total <br />Scarification or Ripping 0.2 $ 390 $ 0 $ 390 <br />300 Trees 1.5 120 107 227 <br />40 Shrubs 0.5 144 58 202 <br />Seed 0.2 30 150 180 <br />Fertilizer 0.2 30 17 47 <br />Freight and tax - - - 30 <br />Maintenance Fertilize <br />(3 Applications) 3 450 - 450 <br /> TOTAL(per acre)... $ 1526 <br />3. Cost for revegetatinq l(one) acre of tailing. <br />- Revegetate at $1,526 (See Item 2) $ 1526 <br />- Topsoiling ($2.00/cy, 1613 cy/a cre) $ 3226 <br />- Liming (2 tons/acre) $. 216 <br /> TOTAL(per acre)... $ 4968 <br />4. Cost per acre for maintenance fertilization. <br />- Contracted out for $150/acre including material. <br />TOTAL(per acre)... $ 150 <br />