Laserfiche WebLink
~ ~ ~ <br /> DENSITY-COMPACTION TEST RESULTS <br />PROJECT: ALMA PLACER MINE PROJECT NO.: 1-4561-11191-10 DATE: 6/13/90 <br />LOCATION:pgRK COUNTY, COLORADO REPORTNO.: 7 TIME: 10.0 HOURS <br />SOURCE: BERM CONSTRUCTION SAMPLE NO.: 1 ENGINEERING TECHNICIAN: DEANGELIS <br />TEST DEPTH PROCTOR OPTIMUM DRV <br />NO. LOCATION OR DENSITY MOI <br />CO <br />TENT DENSITY CO OMPACTIO SOIL TYPE <br /> ELEVATION PCF N pCF % '4~T• R~Q• <br /> <br />50 STA 2+20, Outside of Berm 93.0' 133.5 7.8 130.0 5.1 97 95+ SAND, silty, w/ <br /> gravel, brown <br /> (SW-SM) <br />51 STA 3+75, Outside of Berm 94.5' 130.6 5.0 98 " <br />52 STA 2+50, Ouside of Berm 94.5' 129.2 6.0 97 " <br />53 STA 2+75, Inside of Berm 97.5' 125.4 8.6 94* " <br />53A Retest of No. 53 97.5' 128.8 6.9 96 " <br />54 330' S. o f STA 1+00, Outside of 98.5' 129.0 5.2 97 " <br /> Berm <br />EQUIPMENT: r <br />c Dens i ty <br />Push Cats - 2 TEMPERATURE: F <br />55 <br />65o <br />Compactors - 2 WIND: 5-10 mph <br />Backhoe - 1 PRECIPTCATION: None <br />Water Truck - 1 <br /> DENSITY -COMPACTION TEST RESULTS <br /> ~~ 6EOTECNNICAL, MATERIALS i <br /> J ENVIRONMENTAL CONSULTANTS <br />D f.R-2 <br />