Laserfiche WebLink
<br /> <br /> <br />DAILY DIARY <br />PROJECT: ALMA PLACER MINE <br />LOCATION: PARK COUNTY, COLORADO ' <br />SOURCE: BERM CONSTRUCTION <br />PROJECT N0: 1-4561-11191-10 REPORT N0: 8 DATE: 6/1 /90 <br />PROCTOR N0: N/A TIME: 10. HOURS <br />SAMPLE N0: 1 ENGINEERING TECHNICIAN: DE GELIS <br />WORK PERFORMED: <br />I <br />Fill operations continued today from Stations 1+00 through 3+00. <br />No fill material <br />was placed on the inside of the berm near the south pond. The fi 1 material used <br />today had to be taken from the north pond area, and from the dike between the two <br />ponds. Fill operations proceeded slowly. <br />I <br />REMARKS: <br />Mr. Fred Ladd with Ladd Engineering arrived at the site this afte noon to observe <br />the unstable area near the south pond. Mr. Ladd stated that he wou d have a filter <br />at the site tomorrow to stabilize the area. <br />Ten nuclear-density test and one sand cone density test was perfor ed at the given <br />locations and elevations. All of the test results indicated t at the minimum <br />compaction requirements were met. <br />DAILV D[ARY <br />GEOTECNNICAL. MATERIALS l <br />11 <br />I.~ <br />1I <br />ENVIRONMENTAL CONSULTANTS <br />I <br />