My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP46523
DRMS
>
Back File Migration
>
Report
>
REP46523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:49:45 AM
Creation date
11/27/2007 11:12:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979221
IBM Index Class Name
Report
Doc Date
12/20/2000
Doc Name
PERMIT APPLICATION SEDALIA RECYCLING CENTER AND DEPOSITORY DOUGLAS CNTY COLO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2000 -61- 003-2191 <br />The operator will commence closure activities of each portion of the landfill no later <br />than 30 days after the final waste grades are reached. <br />3.5.7 The owner or operator must complete closure activities of each landfill phase, in <br />accordance with the closure plan, within one hundred eighty days following the <br />beginning of closure as specified in this section. <br />The operator will complete clostue activities within 180 days, in accordance with <br />3.6 POST-CLOSURE CARE <br />The following describes the post-closure caze that the operator will perform in <br />accordance with Sections 3.6.1 through 3.6.3. <br />Following the closure of the facility, the Operator will conduct post-closure care in <br />accordance with applicable CDPHE regulations, as from time to time amended. The <br />following provides a general description of current CDPHE post-closure care <br />requirements. The post-closure cost estimate is provided in Appendix 7. It will be <br />updated annually to reflect any changes in costs, site conditions, or other factors. <br />Current CDPHE regulations require post-closure care for 30 years. The duration of the <br />post-closure caze period may be reduced with approval of the CDPHE. During the post- <br />closure care period the Operator will be responsible for the facility, and may be <br />contacted at: <br />Datry A. Ferguson, President <br />Petrotec International Corp. <br />P.O. Box 887 <br />Durango, CO 81302 <br />Phone: 970-385-7201 <br />FAX: 970-385-6970 <br />Following the post-closure care period, the Operator will notify the CDPHE and have a <br />certification prepared by a Colorado Registered Professional Engineer verifying that <br />wn~iviaieis~en~.ru,~~iioooa« Sedalia Recycling Center and Depository <br />
The URL can be used to link to this page
Your browser does not support the video tag.