Laserfiche WebLink
October 2000 -59- 003-2191 <br />(3) A schedule for completing all activities necessary to satisfy closure criteria of <br />this section <br />Closure Schedule Work Days <br />Notify Departmentof Pending Closure 5 <br />Commence Closure Activities <br />Plan Closure -Receive Proposals 20 <br />Place 2 feet of frost protection 45 <br />Install 1.5 foot of compacted clay 75 <br />Place 6-Inches of Cover 20 <br />Seed Area - In Fall of Yeaz <br />Submit Closure Report to Department 10 <br />Total Time To Close 175 <br />• 3.5.1(B) Discrete Units of a Depository May be Closed Independently of Closure of the Entire <br />Facility <br />The out slopes of the depository will be closed in 25-foot lifrs as the depository <br />progresses. Final cover as described above will applied to these outerslopes as they <br />reach final elevations. This will result in the final cover advancing from the east and <br />then the north and south as the waste reaches final elevation. <br />3.5.2 The final grades shall promote surface water run-off and minimize erosion, and shall <br />have slopes no less than 5% (20:1) and no greater than 25% (4:1). <br />The final grades of the depository aze presented on Drawing 6. The top of the <br />depository is designed to slope to the surrounding edges. Erosion control berms will be <br />placed at approximately mid-height of the cover as shown on Drawing 6. The slope of <br />• the cover will not exceed 25%. The erosion control berms will drain to the corners of <br />the facility, which will then drain to the perimeter channels and the retention ponds. <br />uoorzi9~a~9is~a.u.p~m,~~iaoo aoc Sedalia Recycling Center and Depository <br />