Laserfiche WebLink
October 2000 -56- 003-2191 <br />C. A temporary waiver, based on extreme seasonal climatic conditions, from the <br />requirement of daily and intermediate cover requirements is not being requested. <br />3.3.5 SufficientAmounts ofAdequate Cover <br />The entire depository azea has a capacity of approximately 10,600,000 cubic yazds. <br />There is approximately 4,000,000 cubic yards of soil available for cover material that <br />will be excavated from the facility footprint. Thus, there is approximately 1 cubic yazd <br />of cover soils available for every 2.65 cubic yazds of waste. <br />3.3.6 AdequateAmounts of Water <br />The source of water for construction purposes and to minimize nuisance conditions will <br />be obtained from the on-site deed well. The produced water will be sufficient for dust <br />suppressionon the site and for fire protection. <br />• <br />33.7 Leachate and Depository Gas Condensate <br />Leachate and gas condensate, if any, will be recirculated over the depository. <br />3.4 RECORDKEEPING <br />3.4(A) Incoming Waste Volumes <br />The Operator will keep a record of the volume of waste received by the facility. The <br />volumes will be based upon load counts, size of loads and estimated load factors. <br />3.4(B) Water Quality Monitoring Results <br />The Operator will keep a record of all of the results of water quality monitoring. <br />voorzwvzwis~aar r~,m~~iooo a~ Sedalia Recycling Center and Depository <br />