My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP45698
DRMS
>
Back File Migration
>
Report
>
REP45698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:48:34 AM
Creation date
11/27/2007 10:41:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Report
Doc Date
4/30/1997
Doc Name
1996 AHR MUNGER & MCCLANE CANYON MINES PN C-81-020 & C-80-004
From
DMG
To
JIM BURNELL
Annual Report Year
1996
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.5-1 <br />2.5 SURFACE WATER MONfT'ORING PROGRAM <br />A water quality monitoring program has been established to monitor the effect of mining <br />activities. Portions of this monitoring program, as well as the ground water monitoring <br />program, described in Section 2.6 will cover both the Munger Canyon and McClane Canyon <br />mines which operate in close proximity to one another in the same major watershed. Locations <br />of all surface water monitoring sites are shown on Figure 4.2-2.1s in Volume vII. <br />The quantity of flow at SW-1 will be measured quarterly, contingent upon the availability of <br />water. The design of the bridge over East Salt Creek at McClane Canyon was developed to <br />allow easier monitoring of flow. A flow rating chart has been developed to ensure consistence <br />of flow measurements. Flow measurements will also be taken at SW-3, in Munger Creek below <br />the mine site. The measurements will ideally be taken twice a year if water is available to <br />sample. Measurements will be taken once during spring snow melt and once during a storm <br />event. Flow rating charts for both East Salt Creek and for the culvert at SW-3 are presented as <br />Table 2.5-3. <br />Water all samples of East Salt Creek will be collected quarterly at sites SW 1, SW4,and <br />.____ ~.- <br />SW-8 as shown on Figure 2.3.5. Water quality samples will also betaken on Munger Creek and <br />its tributaries at sites SW-3, SW-6, and SW7 twice a year; once during spring snow melt and <br />~~ 1 t <br />once during a storm event (spring or summer). Table 4.5-12 shows the results of the April, <br />1981 laboratory analyses from East Salt Creek monitoring locations SW-1 and SW-4. All water <br />samples will be analyzed for the parameters shown in Table 2.5-2. The results of all monitoring <br />will be submitted to the Regulatory Authority immediately following receipt of analytical results. <br />During periods of temporary cessation, the monitoring program will be modified as follows. <br />Water quality samples will betaken quarter) fr_y Om_~3. Samples will be analyzed for those <br />parameters listed in the temporary cessation portion of .Table 2.5-2. The quantity of flow will <br />be measured at SW-3 when samples are collected. <br />Mu Volume 1 1 - 9 -96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.