Laserfiche WebLink
• Operation of cavity #2 and possibly cavity #3 will run <br />concurrently with cavity ~1. Production from developed cavities <br />will be utilized to meet heavy market demand. Production from <br />developing cavities will be utilized to meet low demand. <br />Operation and monitoring for cavities ~2 and #3 will be similar to <br />cavity #1 described previously. <br />Flow rates to and from the well is not expected to exceed 800 <br />gallons per minute, either through one well cavity or from a <br />combination of cavities. The normal operating flow rate is 600 <br />gpm. <br />4.0 Status of Surface Facilities and Wells not Abandoned <br />• 4.1 Surface Facilities <br />The surface facilities are approximately 85$ constructed, see <br />Section 2.2 of this report for more detai ls. The access road, <br />electrical powerline, and telephone line are complete. The <br />natural gas line has been install ed with only the <br />metering/pressure reduction stations to be completed in the next <br />month. The access road will be chipped and sealed in 1991. <br />4.2 Abandonment of Wells <br />Na26-IRI-5 will require recompletion or abandonment in 1991. The <br />EPA may require the re-entry of Skyline #1 and Cross V wells, if <br />• it is determi 3 that original abandonment was inadequate. <br />57 <br />