Laserfiche WebLink
<br />4.3 Fencing <br />In 1991 the remaining side (south-east) of the process area will <br />be fenced with four strand barbed wire. Also topsoil stockpiles <br />at Na26-90-5 and 90-1 will be fenced. <br />• <br />58 <br />