• exposed surface area increases each day as leaching increases the <br />cavity size. The leach rate can be increased by increasing the <br />cavity temperature, lowering the crystallization temperature and, <br />to a lesser extent, increasing the flow rate. <br />During the cavity restricted operating period, the greatest flow <br />rate, higher injection temperature and coolest crystallization <br />temperature practical will be used. <br />Following the cavity restricted operating period, mining will <br />continue with the distributor remaining at the original position <br />200' back from SS-1. When 6,000 tons have been mined, the <br />distributor will be pulled back 40' to position #2. While at #2, <br />• 2,600 tons will be mined before moving an additional 80' to <br />position #3 where another 2,600 tons is mined. This will continue <br />until the distributor reaches the final position 995' back from <br />88-1 well. The cavity will have produced 25,000 tons at this <br />point. This is approximately 60$ of the calculated yield of <br />41,000 tons. <br />The cavity will be surveyed at this time. The remaining cavity <br />will then be mined. This may involve circulation without further <br />movement of the injection string, adjustment of the injection <br />string and adjustment of the annulus gas/liquid interface level. <br />Based on present market predictions, the 60$ maturity level will <br />be achieved toward the end of 1991. The remaining 40$ will be <br />• mined in 1992. <br />55 <br />