My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP37836
DRMS
>
Back File Migration
>
Report
>
REP37836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:17:15 AM
Creation date
11/27/2007 7:53:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Report
Doc Date
12/31/1990
Doc Name
THE 1990 PROJECT STATUS AND ANNUAL PLAN OF DEVELOPMENT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 3.3.2 Reclamation <br />The reclamation activity in 1990 included seeding and mulching the <br />majority of disturbed acreage. Minor reclamation will be <br />necessary in 1991 on topsoil stockpiles at the new production <br />wells with one stockpile located on pad near Na26-90-5 and one <br />stockpile on pad near Na26-88-1. Any other minor disturbed areas, <br />such as a pad for recompletion of IRI-5, possibly Skyline #1 and <br />Cross V wells, and product/water pipelines, will be seeded and <br />mulched in 1991. <br />3.4 Planned Mine Field Operation <br />3.4.1 Cavity #1 Mining Procedure <br />• In preparation for solution mining, the injection string in well <br />Na26-90-5 (90-5) will be placed so that the injection distributor <br />is approximately 200 feet back from well Na26-88-1 (88-1). The <br />extraction casing in well 88-1 will be hung vertically <br />approximately 16' below the roof of the Boies Bed. The dilution <br />string in well 88-1 will be set to the same depth as the <br />extraction casing. <br />With the casing in place, circulation of mining solution will be <br />initiated. Preheating the 88-1 well may be performed, but is not <br />presently planned, by directing solution down the dilution string <br /> and up the extraction casing. The flow is directed in and out of <br />• the same well so little solution mining would occur. Production <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.