Laserfiche WebLink
to ship product from the Piceance Basin solution mine. NaTec <br />maintains offices in Rifle, Colorado, for the Mining and <br />Processing Division; Dallas, Texas for Environmental Systems <br />Division; and Houston, Texas for Corporate Management Division. <br />Recently, NaTec purchased AER*X, inc. of Washington D.C. to <br />provide emissions trading services. <br />2.2 New Findings or Developments <br />2.2.1 New Findings <br />As construction is underway and not complete, no process or mining <br />results are available. The only points of interest to date <br />involve hydrology findings. Results from required monitoring <br />• prior to start-up are: <br />a. the Dissolution Surface aquifer, as a result of <br />water quality > 10,000 TDS, has been classified as non- <br />protected aquifer by the EPA. <br />b. pumpage effects from water well (completed in the A- <br />Groove) indicate communication between A and B-Groove <br />aquifers, but not to Perched or Dissolution Surface <br />aquifers. <br />The water pumped from well Na26-90-1 was: <br />June July August <br />Pumpage (gal.) 3,787,100 2,255,300 2,009,520 <br />Average G.P.M. 87.7 50.5 45.0 <br /> September October November <br /> Pumpage (gal.) 1,415,380 4,200,520 136,380 <br />• Average G.P.M. 32.8 94.1 3.1 <br />19 <br />