Laserfiche WebLink
• to NaTec's original access road and on to the mine site. The <br />right-of-way is assigned to NaTec. <br />2.1.7 General Plant Facilities <br />Buildinas <br />Process, utilities, maintenance warehousing and lab facilities are <br />housed in an 80' x 180' pre-engineered metal building. <br />Administration is housed in a 40' x 40' pre-engineered metal <br />building attached to the main process building. Small pre- <br />fabricated, frame, out buildings house water well electrical <br />equipment, lubricants storage and the fire pump. The product <br />storage building is a 100' diameter pre-engineered concrete and <br />• wood frame structure. <br />All permanent buildings and the tank farm area are on concrete. <br />Floor drains and/or sumps collect any spillage and this is routed <br />to the 3 acre process pond for containment. Hazardous materials, <br />such as petroleum products, will be contained in place at storage <br />area. <br />Process Control <br />The mining, processing, and utilities operations utilize a <br />computer based distributed control system. The system handles all <br />closed loop control, monitoring and alarming of process variables. <br />The system also provides trend and reporting capabilities for both <br />control and accounting purposes. <br />17 <br />