Laserfiche WebLink
• The high pressure natural gas will be reduced to 5 psig for in- <br />plant distribution. Gas will be distributed to the MTHW boilers, <br />the steam generator, the flash dryers and direct fired equipment. <br />NaTec will install a back-up propane fuel supply system at a later <br />date. <br />A diesel storage tank is provided in the fire water pump house to <br />supply fuel for the diesel fire water pump. <br />Fire Protection <br />The fire protection system will consist of a diesel powered fire <br />pump and a loop underground piping system with fire hydrants and <br />• hose houses. The building will be equipped with fire <br />extinguishers as required by fire code. The bottom 1/3 (30,000 <br />gallons) of the raw water storage tank is reserved ,for fire <br />protection. <br />A jockey pump will be installed to maintain pressure on the <br />fire loop. <br />The fire loop consists of a buried 8" HDPE pipe (FM approved) with <br />fire hydrants spacing at 250 feet apart. Fire hose boxes are <br />installed on every other fire hydrant. <br />Communication <br />Telephone lines were installed from mile 7 of Ryan Gulch road <br />• (County Road 24), along Yellow Creek Jeep Trail (County Road 83) <br />16 <br />