Laserfiche WebLink
• Plant Air Svstems <br />Plant and instrument air will be supplied by a screw compressor <br />furnishing oil free air at 125 psig output. <br />The instrument air loop will be distributed at 100 psig and <br />reduced at the point of use. In addition to meeting the <br />instrument requirements, the instrument air system will also serve <br />the dust collectors with bag cleaning air. <br />Plant air will serve the maintenance shops and plant utility <br />stations. <br />Electrical Power Distribution <br />• Power is supplied to the site by White River Electric Association <br />from the Horse Draw direction. The right-of-way was secured and <br />will be maintained by White River Electric Association (see Figure <br />2-1 for location of powerline}. <br />Fuel Storage and Distribution <br />A natural gas line has been provided for the on-site distribution <br />network for all site heating requirements. <br />The natural gas is supplied by a 4" line approximately 2.5 miles <br />in length. The BLM right-of-way was issued to NaTec and the line <br />is connected to the Mountain Fuel (Questar) pipeline system. <br />• <br />15 <br />