My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP37807
DRMS
>
Back File Migration
>
Report
>
REP37807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:17:10 AM
Creation date
11/27/2007 7:52:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
5/17/1994
Doc Name
SAN LUIS PROJECT TAILIGNS DISPOSAL AREA PHASE II RAISE 1 FINAL CONSTRUCTION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br />1 <br />1 <br /> <br /> <br /> <br /> <br />ll <br />1 <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br />San Luis Project phase 11 Rain 1 Expansion - Pinal Construction Report <br />5.5.5 Liner Upgrade <br />In 4 of the 57 acres (Acres 35 through 38 as shown on Drawing 14719-102) of the impoundment <br />expansion azea, 50-60 mil VLDPE liner was utilized in lieu of 40 mil VLDPE. The 50-60 mil <br />VLDPE liner met or exceeded all liner specifications. <br />The use of the 50-60 mil VLDPE liner was approved by the Division on October 27, 1993 through <br />Technical Revision TR-014 to Permit No. M-88-112 with the following stipulations: <br />• Stipulation No. 1 -The samples for destructive testing from those seams where 50-60 mil <br />and 40 mil geomembrane materials aze welded should be cut after the seams have been <br />subjected to at least three expansion contraction periods (three consecutive 24 hour periods). <br />• Stipulation No. 2 -Retest the wedge welds of SO-60 mil and 40 mil liner using the permit <br />specified pressure test of the channel after the tested seam has experienced at least three <br />cycles of expansion and contraction (three consecutive 24 hour periods). <br />• Stipulation No. 3 -Notify the Division if the 50-60 mil to 40 mil seams f8i1 at a higher rate <br />than approved in the permit before placing drainage blanket material on the seam. <br />All stipulations were met during wnstruction of the facility and indicated that none of the 40 mil <br />to 50-60 mil seams failed the routine QA,'QC testing or the additional TR-14 testing as described <br />in detail in Section 6.3. <br />5.6 Reporting <br />To document the procedures that were adopted during construction and reflect a higher degree of <br />interface with the Division during construction, Section 7 of the Earthwork Specification was <br />revised. The revised Section 7 is included in Appendix E. <br />8Y I1 rect o. <br />
The URL can be used to link to this page
Your browser does not support the video tag.