My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-09-12_REPORT - M1977129
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977129
>
2005-09-12_REPORT - M1977129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:38:34 AM
Creation date
11/27/2007 7:47:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977129
IBM Index Class Name
Report
Doc Date
9/12/2005
Doc Name
Annual Fee/Report/Map
From
Whitewater Building Materials
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permittee: WHITEWATER BUILDING MATERUU_S CORP. PAGE 2 <br />Permit #: M•77-129 <br />Operation Name: WHITEWATER 500 PIT <br />Anniversary Date: 09/22/05 <br />5.10 acres in Stage 2 - PART B that will be stripped in <br />preparation for mined next year (brown). The red lines on <br />Stages 2 - PART B and E show the approximate locations of <br />the working faces. The arrows show the direction of mining <br />next year. Additional stripping will be done ahead of the <br />working face. <br />(2) Sloping is complete on the 6.26 acres ± around parts of the <br />lake in Phase 2 - PART A (green). The blue cross hatched <br />areas show where we have material stored to create slopes in <br />Stages 2 - PART A & B. Only the final grading is necessary <br />on these areas. Topsoil stockpiles have been placed along <br />the tops of these slopes for recoiling when they are com- <br />plete. Sloping is complete on 1470 Peet on the south side <br />of Stages B, C, and D (green). <br />Reclamation is complete in the 20.0 acre area in Stage 4 - <br />PART B where borrow material was removed. The area was <br />seeded during the spring of 2005. It is too early to assess <br />the success of revegetation at this time and we continue to <br />monitor the area. If needed, additional seeding will be <br />done next year. This area will eventually be mined. We may <br />request a bond reduction for this area since all grading, <br />shaping and recoiling is complete. <br />There is approximately 35,000 cy of overburden stored in <br />Phase 2 - PARTS A, & B & Phase D that will be used on the <br />alpha stages and in Phase 2 - PART A as needed (orange). <br />These piles are in a constant state of flux as areas are <br />stripped and recoiled. In addition, inert materials are <br />being removed from the floor of the mined areas to supple- <br />ment material needed for sloping. The settling pond is <br />still being used to clean process water (tan). The stock- <br />piles on the lake bottom in Phase 2 - PART A will be removed <br />or leveled as needed. The access corridor is being utilized <br />to cross the highway when material from the mined area is <br />moved to the plant (heavy blue line). <br />Technical Revision #2 was approved 1/19/05 regarding <br />revegetation on Phases X, Y, & 1. These area were prepared <br />and seeded per the approved plan in the fall of 2004. The <br />site was inspected by Mr. Shuey on 7/13/05. He indicated <br />that revegetation is progressing favorably. We continue to <br />monitor the work done to date and some remedial work may be <br />need in the future. <br />Weed control continued this year on the area around the <br />active mine and on the area around Phase 1. We sprayed <br />Knapweed and White Top on April 15, 21, May 19, 23 & 24, and <br />June 7 & 8, 2005 with water soluble 2-4-D and Curtail'. It <br />appears that spraying is finally beginning to have positive <br />results against the Knapweed and White Top. This is still <br />
The URL can be used to link to this page
Your browser does not support the video tag.