My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP37154
DRMS
>
Back File Migration
>
Report
>
REP37154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:15:52 AM
Creation date
11/27/2007 7:41:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
1/23/2002
Doc Name
2000 ARR and AHR, Compliance Review Memo
From
BYRON G WALKER
To
FILE C-81-019
Permit Index Doc Type
ANNUAL RECLAMATION REPORT
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />January 23, 2002 <br />Page 2 of 4 Pages <br />Pond 1~` Quarter 2" Quarter 3T Quarter 4 Quarter <br />Pros ect 2-21-00 5-23-00 9-13-00 11-06-00 <br />West Pit 3-06-00 5-23-00 7-27-00 12-04-00 <br />Section 16 1-04-00 5-23-00 7-27-00 10-23-00 <br />East Ta ]or 3-06-00 5-23-00 7-27-00 12-04-00 <br />` This report was reviewed by a registered engineer on 3-31-00 <br />2 This report was reviewed by a registered engineer on 7-14-00 <br />3 This report was reviewed by a registered engineer on 10-23-00 <br />° This report was reviewed by a registered engineer on 1-02-01 <br />Rule 4.05.9(13): Inspections. All impoundments shall be examined to assure appropriate <br />maintenance of the structure and for struckiral weakness, erosion and other hazardous conditions <br />by a qualified registered professional engineer or a qualified individual under their direction. The <br />professional engineer or individual shall be experienced in the construction of impoundments. The <br />inspections shall be made regularly during construction, upon completiorz of construction and, ar <br />a minimum, quarterly thereafter, with the report retained at or near the mine site. A copy of the <br />report shall be submitted to the Division on an annual basis by a registered professional engineer. <br />The report is in compliance with this rule. Sediment pond impoundments aze reviewed in the <br />foregoing paragraph. Other impoundment quarterly inspection reports (reports) are maintained at <br />the mine site (see Division inspection reports). The quarterly inspection reports are reviewed in <br />this findings as such reports are submitted to the Division annually in the Annual Hydrology <br />Report (AHR). These other impoundments were inspected quarterly for structural weakness, <br />erosion, and other hazazdous conditions, and were reviewed by a registered professional engineer <br />on the dates indicated (Tanks are livestock water tanks) in the following table. <br />Ira oundment 1~` Quarter 2" Quarter 3` Quarter 4 Quarter <br />Wash Ba 3-27-00 5-23-00 8-01-00 12-07-00 <br />Taylor Pump <br />Holdin 3-06-00 5-23-00 8-01-00 12-04-00 <br />Tank A 3-06-00 5-30-00 9-06-00 10-17-00 <br />Tank B 3-06-00 5-30-00 9-06-00 ]0-17-00 <br />Tank C 3-06-00 5-30-00 9-06-00 10-17-00 <br />Tank D 3-06-00 5-30-00 9-06-00 10-17-00 <br />Tank E 3-06-00 5-30-00 9-06-00 10-17-00 <br />Tank F 3-06-00 5-30-00 9-06-00 10-17-00 <br />Tank G 3-06-00 5-30-00 9-06-00 ]0-16-00 <br />Tank H 3-06-00 5-30-00 9-06-00 ]0-16-00 <br />Tank I 3-06-00 5-30-00 9-06-00 10-16-00 <br />Tank J 3-06-00 5-30-00 9-06-00 10-16-00 <br />Tank K 3-06-00 5-30-00 9-06-00 ]0-16-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.