Laserfiche WebLink
iii iiiiiiiiiiiuiii <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />• <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 D I v 15 t O N O F <br />Phone. 1303) 866-3567 MINERAL S <br />FAX: (303)832-8706 & <br />interoffice G E O L O G Y <br /> <br /> <br />MEMORANDUM 0.EC LAM ATION <br />MINING•SAFETY <br /> Bill Owens <br />to: File C-81-019 Colowyo Coal Mine, 2000 Annual Hydrology Report c°ver"°` <br />from: B on G. Walkeu..- ~ <br />}? Greg E. Walther <br />Enecutive Director <br />subject: Review for Compliance Michael B. long <br />date: January 23, 2002 Division Director <br />• <br /> <br />Rule 4.05.6(13) was superseded by Rule 4.05.9(17) on March 21, 2001. Rule 4.05.6(13) was in <br />effect during the time covered by this Annual Hydrology Report. <br />Rule 4.05.6(13): Inspections. All sedimentation ponds shall be examined by a qualified registered <br />professional engineer or other qualified individuals under their direction. The professional engineer <br />or individual shall be experienced in the construction of sedimentation ponds. Ponds shall be <br />inspected for structural weakness, erosion, and other hazardous conditions. The report shall also <br />include the level of the sediment in the pond and any other required maintenance of the structure. <br />These inspections shall be made regularly during construction, upon completion of construction and, <br />at a minimum, on a quarterly basis thereafter. The report shall be retained at or near the mine site <br />and a copy of the report promptly submitted to the Division on a quarterly or annual basis, as <br />required by the Division, by a registered professional engineer. <br />The report is in compliance with this rule. Sediment pond inspection reports (reports) are <br />maintained at the mine site (see Division inspection reports). The reports are reviewed in this <br />findings as such reports are submitted to the Division annually (Permit page 4.05-7) in [he <br />Annual Hydrology Report (AHR). No sedimentation pond was constructed or was construction <br />completed on any pond during the reporting period. Thus the requirement for quarterly <br />inspections is the only continuing requirement. Sediment ponds were inspected for structural <br />weakness, erosion, and hazardous conditions; reviewed by a registered professional engineer; <br />sediment levels were reported; and required maintenance reported; on the dates indicated. <br />Pond 151 Quarter 2" Quarter 3` Quarter 41 Quarter <br />Streeter Fill 2-21-00 5-24-00 8-01-00 i1-06-00 <br />Work Area 2-17-00 5-24-00 7-27-00 10-23-00 <br />Gossard Loadout 3-06-00 5-23-00 7-27-00 12-07-00 <br />Gulch A 2-21-00 5-23-00 9-17-00 11-06-00 <br />Stoker Coal <br />Loadout 2-17-00 5-23-00 9-16-00 11-06-00 <br />Gossard Loadout <br />Loo 3-06-00 5-23-00 9-13-00 11-06-00 <br />