<br />1 <br />' September 28, 1998 <br />If the embankment is 'over built', the engineer should be notified for <br />clarification. <br />' 3.5 COMPACTION EQUIPMENT <br />A. General <br />The Contractor shall provide sufficient compaction equipment of the types and sizes <br />' suitable as is necessary for compaction of the various fill materials. <br />The Contractor's procedures for compaction of fill shall be subject to the approval <br />of the Engineer. Compaction of each layer of fill shall proceed in a systematic, <br />orderly and continuous manner approved by the Engineer, such as to ensure that <br />all of each layer receives the compaction specified. The compaction shall be <br />' carried out by routing the compaction equipment parallel to the axis of the <br />embankment or fill, except that where such routing is impractical such as in roller <br />turning areas, in areas adjacent to foundations or at the lower elevations of the fill, <br />in areas adjacent to pipework and where otherwise required by the Engineer, the <br />' compaction equipment may be routed in any direction approved by the Engineer. <br />Special attention shall be paid to the soil synthetic liner interface. Compaction will <br />t be achieved using the following compaction techniques in the soil synthetic liner <br />interface area without causing damage to the synthetic liner. <br />' D. Special Compactors <br />Special compactors shall be used to compact materials which, in the opinion of the <br />Engineer, cannot be compacted properly by the Specified sheepsfoot or vibratory <br />rollers because of location or accessibility. <br />The Contractor shall adopt special compaction measures such as hand-held <br />vibratory compactors or other methods approved by the Engineer to compact fill in <br />trenches, around structures and in other confined areas which are not accessible <br />to the larger vibratory roller or sheepsfoot roller type compactors. Such compaction <br />' shall consist of not less than 4 coverages of the compaction equipment <br />' 3.6 QUALITY CONTROL <br /> <br /> <br /> <br />The Engineer will conduct field tests and the related laboratory tests to determine the <br />percent compaction and other properties. <br />The Contractor shall give the Engineer full cooperation in sample taking or making tests and <br />shall render such assistance as is necessary to enable sampling and testing to be carried out <br />expeditiously. The Contractor shall allow sufficient time for the Engineer to perform the required <br />test work in order to determine the acceptability of each lift. The making of such tests or the time <br />' J:\5x81\$PECSFNL WPD <br />Earthwork <br />02200-10 <br />