My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP36799
DRMS
>
Back File Migration
>
Report
>
REP36799
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:15:00 AM
Creation date
11/27/2007 7:35:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Report
Doc Date
1/28/1993
Doc Name
1992 PROJECT STATUS AND ANNUAL PLAN OF DEVELOPMENT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• j. Both wells associated with Cavity #1 passed the mechanical integrity <br />tests. <br />k. Applications to drill the wells associated with Cavity #2 were <br />extented until mid 1993, no drill pad preparation or drilling occurred. <br />I. Curtains were installed at the entrance to storage dome to control <br />dust. <br />m. The A-Groove water well produced 17,445,700 gallons in 1992. <br />o. The location for discharge flow from the crystalizers was changed and <br />greatly reduced heat exchanger plugging problems. <br />3.2.3 Prooosed 1993 Activities and Schedule <br />• Marketing in 1993 will focus on continued penetration of the traditional bicarb <br />market as well as continued development of the Flue Gas Desulfurization (FGD) <br />applications. The Clean Air Act compliance date of 1995 means slow FGD growth <br />in 1993. FGD is expected to become a major market by 1995. WRNM anticipates <br />production of approximately 62,500 tons in 1993. The plant will be on a <br />continuous production schedule with scheduled down time only for plant <br />maintenace, cavity surveys, etc. <br />No significant changes in monitoring, mining method, or crystallization are <br />anticipated in 1993. WRNM will propose mining 1500' cavities (#2 and #31 and <br />drilling asonar/subsidence monitoring well over cavity #2. Regulatory approval <br />will be required. Process changes in dewatering and drying will result from <br />• planned equipment changes. Also, plans for production of food grade bicarb will <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.