Laserfiche WebLink
• e. Increase bicarb production with minimal or reduced levels of <br />temperature and flow. <br />f. Minelproduce 24,000 tons from Cavity #1. <br />g. Sonar survey Cavity #1 early in 1992 and toward the end of the year. <br />h. Conduct mechanical integrity tests on the wells associated with <br />Cavity #1, and Cavity #2 prior to production. <br />i. Revegetate topsoil from Cavity #2 drill pads and hydromulch areas <br />seeded in the fall of 1991. <br />j. Redirect dust collector air flow to the outside in the storage dome to <br />reduce fugitive dust emissions. <br /> <br />k. Evaluate market for bicarb fines and, if feasible, build separate <br />storage and scale units. <br />I. Sample pregnant/barren liquor twice/week and analyze in the facility <br />laboratory for specific gravity to develop alternative to density <br />instruments on wellheads. <br />m. Clean-out blockage in IRI-1 monitoring well and begin collection of <br />water level data. <br />3.2.2 Actual 1992 Production and Activities <br />. The following was accomplished in 1992: <br />9 <br />