Laserfiche WebLink
WRNM <br />• November 0 775 0 775 <br />December 775 2 4 1 4 1.274 <br />TOTALS 19,320 482 18,930 1,274 <br />Adjustment made as a result of scale calibration. <br />• • Adjustment based on inventory estimate when Joint Venture was signed. <br />• • • NaTec sold all inventory in the barn on the date of closing. <br />3.2 ch 1 <br />3.2.1 1992 Planned Production and Activities <br />The annual plan for 1992 proposed the following: <br />• a. Following an extended shut-down, the plant was scheduled to resume <br />operations in mid-January on a continuous schedule rather than 10 <br />days on and four off. <br />b. Completion of the wells required for Cavity #2 and slow development <br />of the cavity for future production needs. <br />c. Continue redirection of plant flow for seeding crystallizers, and COy <br />addition tests. <br />d. Evaluate minor process changes, i.e. heat exchanges, piping, pump <br />impeller speeds and dryer operation to develope larger crystals, to <br />meet marketing demand. <br /> <br />8 <br />