Laserfiche WebLink
Perrnittee: WHITEWATER BUILDING" MATERIALS CORP. ~ PAGE 2 <br />Permit #: M-7T-729. <br />Opeiatio~;Name: WHITEWATER: SOO PIT .. ' ' <br />Anniversary Date:'" 0912ti07' ~- <br />- (2) Most of ..the reclamation is complete in Phase 1. at this time , <br />and.'t~e.lake surface has stabilized highe.r"than expected. The <br />final road graveling and grading was completed (heavy brown ' <br />line) and a 300 foot long are in Stage B was graded and shaped <br />this year , as. sh'own' on -Sheet 1' ~of 2 . The operator completed; <br />sloping on. 1.75 acres on :the south side of •Stage.2 this year <br />'bringing ,the' total sloping length to 3540 linear feet. along <br />the..north, west;,"and south sides. of the lake in Stage 2' <br />,(blue). The green cross hatched areas show where we have <br />material stored-to create slopes.'in the~same area: Only the" <br />final grading is necessary on this area. Sloping was coin-., <br />pleted in three area in Stage D.tiiis year (blue). There.is, <br />approximately 60,000 cy of overburden •stored.in Stages 2,.&'C <br />.'that will be used on the .alpha stages and in Stage 2 as needed <br />(yellow): These piles are in a constant state."of'flux.as <br />.areas are stripped and iesoiled. The settling pond is still <br />being used to clean process water (brown): <br />Weed control continued this year on the area around the active <br />.mine. Whitewater sprayed for Ktiapweed on May 26"& 27, 2001 <br />and applied a second treatment on June 8 & 9. .This is" an <br />uphill,batLle"since .there is little or no control. taking place <br />on properties surrounding. the mine and seed is being wind. <br />blown"in from'offsite areas that they. have no control over. <br />Spraying will: continue as needed.. , <br />Monitoring continues on the area. seeded in .1999 in Phases Y <br />and 1..-'The light green. area was seeded November 29 and 30, <br />1999 with the'Lake Area. Mix. The areas colored dark, green was <br />seeded with the approved:Terrace Area Seedmix on December 1, <br />T999. "The operator will evaluate the 'site next spring to' <br />determine if additional seeding will be'needed..Remember, that <br />the area inside the road in Phases 'X &.Y are cattle feed areas <br />and do not have to be revegetated. -Please refer to Map l of 2 <br />(west area) in this annual report .for the-areas discussed <br />above'. The area where sloughing has taken place on the east <br />"aide of the"lake remains as it was last year (tan). It'covers <br />an area approximately 175 yards wide. • <br />As noted in.the past the Federal Government was attempting to <br />acquire ,this area. We understand that they. now 'own .the-site <br />and are evaluating,with plans .to breach ttie river bank 'in the <br />sluff area. They have requested. the operatoi will hold off <br />stabilizing this.area.until they have competed their.evalua- <br />tion. <br />(3) Mining. will begih on 4.37 acres .± in Stage 2 this year and on <br />'the 0.63: acres ± stripped in .Stage E.(purpl'e). If more .area , <br />is needed,: we will resume stripping toward the northeast"side. <br />of Stage 2 acid in Stage E. The operator will continue to <br />stockpile growth medium along the perimeters of the mined <br />area, so sloping can be done when mining ends.. <br />