Laserfiche WebLink
ivision of Minerals and.Geologp ~. <br />' Minerals Section. <br />-1313 Sherman Street Suite 215 ~ ; <br />Denver; Colorado~80203.-2273 <br />.Gentlemen: <br />Re: .Annual Report, MLRB:File.M-77-129;' <br />'whitewater Pit 500 - Mesa County <br />Anniversazy Date: 09/22/2001 <br />Federal. Taz.IP # <br />.Environment,. Inca, is.preparing and submitting this report on, <br />behalf of:Whitewater-Building Materials Corp.. This pit HAS NOT <br />been granted a Temporary Cessation and it 8AS operated more than. <br />180 days this year.. The Financial Warr.anty.for.this.operation is <br />~.$167,500,,.and the permitted .area is.689.01 ac. ± and the `pit is <br />divided into 19 Reclamation Phases. An amendment to the permit'was.. <br />approved on October 27, 1999 and the. maps attached are based'"on the" <br />'maps, that are part of the.existing permit. Reclamation is pro- <br />gressing as approved in the~amehdment." ~ , <br />As required in .Rule 6.7 the mine, permit sign has been in- <br />stalled at the. entrance to .the pit and the boundary has been out- <br />lined with'red,toped posts to `delineate the affected lands..- <br />Please refer t:o.the attached maps for location .of the areas <br />discussed in this. report. ,These maps do not~show the entire permit <br />area, only, the area south.b€ the river affected:•by'.the operation at <br />this time. .Map •1 of 2.shows the. west a"rea where only,recl,amatibn" <br />is taking. place. Map 2 of 2,shows the eastern part of the mine.' <br />where mining is taking place.. <br />We ??will dea3 specifically'with.each of the Annual Report " <br />..requirements aS.outlined in Rule'1:15 of the Ryles and Regulations. <br />(1) Mining..continued in Stage 2, and Stage E as approved in our , <br />plan. Mining is.compiet'e on 3.95 acres ± in Stage..2; and 0,57 <br />ac. *_ in Stage B. as shown .on 'the Annual Report Map (/1/). "The <br />P1ant.Site in Stages W; Z and 2 is•still in use (lite green). <br />There are 4;37 acres. in 'Stage 2 and .0.63 in Stage E. stripped, . <br />ready for mining (purple): The orange: lines on.Sta"ges 2 and E <br />show the 'approximate location of the working face.. <br />~ - <br />I .. .. _' <br />