Laserfiche WebLink
Pcrrnittee: WHITEWATER 8111LDING MATERIALS,CORP. ~ PAGE 3 <br />Permit #: Mr.7T-129... ... . <br />Operation. Name, : ~ . WHITEINA7ER 500 P.IT , . <br />AnniVersary.Dateb ~, 09l22/OY , <br />(4) Remedial work, remains oh the slump'area shown on the Map _l of <br />2 (tan). We: are still awaiting word from the landowners, <br />regarding their plans and expect this to be complete this.• <br />year. '.Weed control will continue next year as needed. Bank <br />sloping and grading. will continue in, Stage 2, once mining. is <br />completed ori.the shore line that will."not'be disturbed in..the. <br />future. The material to compl"ete:the sloping is in place <br />(green cross.tiatch.), s.o only shaping is needed tb complete <br />them. , <br />(5). The current contact for this pit is:. <br />Mr. Edward Gardner (970) 242-7538, <br />Whitewat2r Building Materials Corp.' Fed Tax ID # <br />940 South 10th.Street <br />Grand Junction, CO 81502 , <br />The annual report date is September 22',.2001 and:tlie effective <br />date of.a11 information. is.Sep£ember 15, 2001:. This packet con- <br />tains the Annual Report Maps = Sheets l of 2'& 2 of 2. The Annua3 <br />Fee check was mailed to the Division in September 2001 under..sepa- <br />rate cover. <br />Respectfully. Submitted <br />Environment, Inc. <br />~~. <br />Stevan L.'O'Brian <br />President` , <br /> <br />