Laserfiche WebLink
<br />Page 3. <br />Annual Report <br />Larnr Saet Pit ,~7•/-572 <br />Yalco Inc. <br /> <br />that reclamation is progressing. <br />The shoreline will be propertly eloped using <br />equipment such ne front-end loaders, dozers anti <br />graders. <br />The minirum of 6" of topsoil will be placed. on <br />the lakeahore area by the sere equiprent used <br />for eloping. There is presently more than <br />19,000 cubic yards of topsoil material stock- <br />piled for this purpose. (See Nap ~2.) These <br />piles are protected from errieion by a cover o1' <br />natural greases of the area and ruesiar thietlei. <br />Our calculations show that we will need approx-• <br />imately 14,000 cubic yards of this materiel to <br />cover the shoreline area, both Beat and west of <br />railroad bridge that bisects the property. <br />2. Future plane for the area east of the railroad <br />bridge are uncertaisnnt this tire, ifs plan to <br />have the area core drilled for raterinl eamplee~ <br />in 1983 to help determine our future riving plane <br />for this area. Once this is completed ve will <br />be better prepared to address this ratter, botk~ <br />fror a riving and reclamation aspect. ifs have <br />had several requests fror custorere to take <br />materiel frog this area but we have refused then <br />because we are concerned about reclaration and <br />our co®itmente to it. <br />3. The total acres of affected land, both east and. <br />vest of the railroad bridge, is 67.97 acres. <br />Roxever 9.29 acres of this does not require bonding <br />because it is exempt. There is also n considerable <br />amount of lake surface (or pond surface) acres in <br />Stage 0 part I. and II. that do not require bonding. <br />I would eetiaete this to be eonewhere between 5d/ <br />and 75K of the total acres in these stages. It is <br />also difficult to estimate the water surface area <br />of stages Z and TR ~F1, We agree that the bonding <br />for the number of disturbed sores needs to be <br />increased fror the present 15.37 acres, but arriving <br />nt the correct mount xill require the Divisions <br />assistance and input. We would therefore request <br />that xe get together at the earliest coavienient <br />tiro for both parties and reach a suitable agreement. <br />