Laserfiche WebLink
_ professional standards, certified by a registered <br />-' professional engineer, and approved by the Division. <br /> COMMENT: The evaluations performed and presented within <br /> this report were performed by or under the direct <br /> supervision of a registered professional engineer. In <br />- addition, construction drawings and specifications will be <br />' prepared with the same standards. <br /> Ri~IP 4.09.1(3) Alternative specifications may be utilized <br /> <br /> after approval by the Division upon thorough analytical <br /> demonstration, by a qualified registered professional <br />- engineer, prepared in accordance with 2.05.3(6)(b), (c) and <br />' (d), that such alternatives shall be as environmentally <br /> sound and structurally stable as that resulting from fills <br /> complying with the requirements of 4.09 and with such other <br /> criteria as ate necessary to achieve reclamation in <br />- accordance with the requirements of this Rule, taking into <br />' consideration physical, climatological and other <br /> characteristics of the site. <br />n <br />COMMENT: General construction requirements and design <br /> conditions are presented in Section 5.0 <br /> R~~1P 4.09.1(4) All vegetation and organic materials shall <br />' be removed from the disposal area and the topsoil shall be <br /> removed, segregated, and stored or replaced under 4.06. If <br /> approved by the Division, organic material may be used as <br /> mulch or may be included in the topsoil to control erosion, <br /> <br /> promote growth of vegetation, or increase moisture retention <br />' of the soil. <br /> <br />29 <br /> <br />