My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP35645
DRMS
>
Back File Migration
>
Report
>
REP35645
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:12:58 AM
Creation date
11/27/2007 7:11:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Report
Doc Name
APPENDIX 1-B TO BLUE RIBBON COAL COMPANY TR REQUEST MINE BENCH STABILIZATION
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 6.0 N1LRD REGDLATIONS <br />" 6.1 Introduction <br />To provide assistance in the completeness review for the <br />stabilization of the Blue Ribbon mine bench, a review of <br />appropriate regulations and discussions concerning the <br />appropriate conditions to satisfy these regulations is provided. <br />The format for this section includes regulation numbers and <br />reference to appropriate sections of the report or discussion of <br />appropriate actions to be taken. <br />-' 6.2 Regulations <br />I $ylQ 4.09 Disposal of excess spoil and underground <br />development waste. <br />I $~g 4,.09.1 General $Q,auirements <br />I Rule 4.09.1(1) All spoil or underground development waste <br />- not required to achieve the approximate original contour <br />within the area where such material has been removed shall <br />be hauled or conveyed to and placed in designated disposal <br />areas within a permit area, if disposal areas are authorized <br />for such purposes in the approved permit application in <br />accordance with 4.09. The spoil or waste shall be placed in <br />I a controlled manner to ensure: <br />COMMENT: The project requires a volume of underground <br />I development waste well beyond what Blue Ribbon could pzoduce <br />I , during the construction period of the project. Therefore, <br />underground development waste will be impocted to the <br />project. There will be no excess spoil or underground <br />development waste generated from the project. if there were <br />• <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.