My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP32689
DRMS
>
Back File Migration
>
Report
>
REP32689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:49 AM
Creation date
11/27/2007 6:18:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Report
Doc Date
2/1/2006
Doc Name
Annual Rpt- 2005
From
Natural Soda Inc.
To
DMG
Permit Index Doc Type
Annual Reclamation Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
manner. Two undesirable event reports were filed in 2003 and one was reported in 2004. <br />Twelve site inspections by the BLM and one inspection by the EPA were performed. <br />3.1.4 Proposed 2006 Activities and Schedule <br />Processing <br />Natural Soda, Inc. anticipates sales in excess of 100,000 tons in 2006. Aggressive mining of <br />sodium bicarbonate deposited in the process pond is scheduled to begin as freezing <br />conditions subside. Six boil outs of three days duration are planned in 2006. Engineering <br />activities will continue on the design of three projects: 1) on-site packaged products <br />warehouse, 2) upgrade to the current version of the Rosemont Distributive Control System <br />for process control and 3) upgraded controls and economizer installation on the two process <br />boilers. The marketplace has been receptive to the increase in fines when all of the fines <br />from the process are sold in animal feed and industrial grades packaged product. NSI <br />anticipates continuing to sell all of the dried product produced, rather than recycling the fine <br />reject stream back into the barren solution and then to the wells. <br />Well field <br />A two hundred ninety foot pull-back in 6H injection well is planned for February, 2006. <br />Completion reports for the two wells drilled in 2005 (7H-1 R recovery and 7H-21 injection) will <br />be submitted. Shut in wells, 4A-4V, 4A-6V, and 3A-5V, are scheduled to be plugged and <br />abandoned. Due to low flows in the converted raw water supply well 2A-2V, it will be <br />plugged and abandoned. One of the proposed P/A wells, either 4A-4V or 4V-6V, may be <br />permitted and converted to a raw water well, rather than P/A. <br />-g- <br />
The URL can be used to link to this page
Your browser does not support the video tag.