My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP32689
DRMS
>
Back File Migration
>
Report
>
REP32689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:49 AM
Creation date
11/27/2007 6:18:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Report
Doc Date
2/1/2006
Doc Name
Annual Rpt- 2005
From
Natural Soda Inc.
To
DMG
Permit Index Doc Type
Annual Reclamation Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 2005 PROJECT ACTIVITIES <br />4.1 On-Site Facilities and Process Description <br />4.1.1 General Arrangement <br />Figure 2-1 and 2-1A illustrate location of project leases and mining area. <br />4.1.2 Lab Operation /Sanitation/ ISO <br />In 2005, activities continued in the lab to provide analysis for process control, quality <br />assurance, and regulatory requirements. The plant operators performed several crucial <br />process control analyses. Chloride levels were measured on the #1 product three times per <br />twelve-hour shift and patch tests were run once per shift to measure insolubles. Pests were <br />controlled with the use of two UV bug lights, the placement of rodent traps around the interior <br />walls of the plant, and the utilization of an ultrasonic bird repeller in the warehouse. Semi- <br />annual GMP/sanitation training was provided for all employees. Mr. Frank Szostek, food safety <br />auditor with AIB International, performed the annual sanitation audit and the audit resulted in a <br />"superior" rating. AWWA, FDA, NSF, Kosher, and ISO re-certification were obtained. <br />4.1.3 Process <br />No significant changes were made to the process system. The two major projects were the <br />replacement of the 4" hydro clone system with a new stainless steel system and the <br />replacement of the centrifuge. Another major improvement was the replacement of the old <br />water softening system with the new one. Several minor improvements included: a monorail <br />used to install the centrifuge, repairs to the plant roof, new doors installed to replace the broken <br />ones, a stainless steel clad chute installed between #2 and #3 tanks, dock locks installed on the <br />loading dock and the installation of a new heat exchanger in place of the old #1 heat <br />exchanger. (See Process Flow Chart Figure 4-1). <br />-9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.