My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP32598
DRMS
>
Back File Migration
>
Report
>
REP32598
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:46 AM
Creation date
11/27/2007 6:17:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
7/14/1993
Doc Name
SAN LUIS PROJECT TAILINGS DISPOSAL AREA TECHNICAL SPECIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The Owner reserves the right to furnish and install all portions of the work described with his <br />own forces if he so desires. Work not covered by these Specifications includes permanent <br />millsite access roads, pumping systems for tailings delivery and water return, and electrical <br />utility lines and poles to the disposal area facilities. <br />1 1.2 Inspection of Work <br />Unless otherwise specified, full-time inspection of all construction activities defined by the <br />Specification will be provided by the Owner. The Owner's inspection of all work shall be <br />performed under the supervision and control of the Engineer or his designated representative <br />while such work is in progress. Said inspections are for the convenience, satisfaction, and <br />benefit of the Owner in determining that the work is performed in strict accordance with these <br />Specifications. Tt shall be the Contractor's sole responsibility to provide all required materials <br />(both natural and manufactured) and to perform all work in conformance with the Specifications. <br />The Owner's inspections and approvals shall not relieve the Contractor of responsibility for the <br />adequacy and acceptability of the finished work or portions thereof. All work p@rformed by the <br />Contractor shall be subject to final approval by the Owner and the Engineer, but the detailed <br />manner and method of doing the work shall be under the control of the Contractor. <br />The Engineer and his representative(s) shall at all times have access to the worla whenever it is <br />in preparation or progress. The Contractor shall fully cooperate with the Engineer by providing <br />proper facilities for access, and shall furnish labor and equipment reasonably needed for safe and <br />convenient inspection. The Contractor shall give the Engineer ample notice of Beadiness of the <br />work for inspection, and the Engineer will perform said inspection in such a manner as not to <br />' unnecessarily delay the work. <br />1.3 Definitions <br />' The following definitions apply to these Specifications: <br />' "Owner" is defined as an authorized representative of the Battle Mounlairt Resources, <br />[nc.; <br />' • "Engineer" is defined as a qualified representative appointed and authorized by the <br />Owner; <br />' • "Contractor" is defined as the party which has executed a contract agreemdnt with Owner <br />for the work outlined by these Specifications and the Drawings; <br />• "Specifications" are defined as the descriptive sections within this documQnt prepared by <br />Steffen Robertson and Kirsten (U.S.), Inc. for the San Luis Project Tailings Disposal <br />Area; <br />:_ <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.