Laserfiche WebLink
<br />Henderson Mine, Permi[ #M-77-342 <br />Site Specific Reclamation Costs <br />Page 6 <br />19. Mill water return line/Power line (31 acres) <br />a) Grading and site prepazation. $ $ <br />b) Revegetate (8 acres at $1,810/acre). $ 14 <br />c) Fertilize slopes (16 acres at $170/acre, 1 application) $ 3 <br />d) Buffer, 7 acres $._~ <br />Total... $ 22 <br />20. Seep water canaVPump house (52 acres) <br />a) Dismantle. $ 0 <br />b) Grading and site prepazation. $ 8 <br />c) Revegetate (8 acres at $1,810/acre). $ 14 <br />d) Fertilize slopes (41 acres at $170/acre, 1 application) $ 7 <br />e) Buffer, 3 acres $- o <br /> Total... $ 29 <br />21. Topsoil stockpiles/roads (190 acres) <br />a) Revegetate (44 acres at $1,810/acre). $ 80 <br />b) Buffer, 146 acres ~_0 <br />Total... $ 80 <br />22. Spotted doe area (24 acres) <br />a) Buffer, 24 acres $0 <br />Total... $ 0 <br />23. Lost Creek Reservoir shores (588 acres)z <br />a) Permanent use road (5 acres) $ 0 <br />b) Revegetate (20 acres at $1,810/acre). $ 0 <br />c) Fertilize (95 acres at $170/acre, 1 application) ~_o <br />Total... $ 0 <br />Sub-Total... $ 6,171 <br />24. MLRD Administration fee (3.5% ofsub-total) $ 216 <br />TOTAL (thousands)... $ 6,387 <br />Z Reservoir is currently not constructed nor is there a plan to construct in the r..eaz future. <br />Therefore revegetation and fertilization costs aze not included. <br />