Laserfiche WebLink
i r <br />Henderson Mine, Permit #M-77-342 <br />Site Specific Reclamation Costs <br />Page 5 <br />13. Borrow azea (4 acres) <br />a) Revegetate (3 acres at $1,810/acre). $ 5 <br />b) Fertilize shores (1 acre at $170/acre). $__o <br />Total... $ 6 <br />14. Power line/Refuse Area (17 acres) <br />a) Dismantle. $ 0 <br />b) Grading and site preparation. $ 11 <br />c) Revegetate road bed (3 acres at $1,810/acre). $ 5 <br />d) Fertilize slopes (14 acres at $170/acre) ~._2 <br />Total... $ 19 <br />15. Makeup water line/Pump house (8 acres) <br />a) Dismantle. $ 0 <br />b) Grading and site preparation. $ 2 <br />c) Revegetate pump house (I acre at $1,810/acre). $ 2 <br />d) Fertilize (7 acres at $170/acre) $__l <br />Total... $ 5 <br />16. Tailing line/Power line (47 acres) <br />a) Dismantle. $ 0 <br />b) Grading and site preparation. $ 8 <br />c) Revegetate (5 acres at $1,810/acre). $ 9 <br />d) Fertilize slopes (27 acres at $170/acre, 1 application) $ 5 <br />e) Buffer, 3 acres ~ ._ Q <br /> Total... $ 22 <br />17. East Branch flood bypass (5 acres) <br />a) Fertilize (5 acres at $170/acre) $.- __1 <br />Total... $ 1 <br />18. Tailing buildinglroad (45 acres) <br />a) Grading and site preparation. $ 8 <br />b) Revegetate (6 acres at $1,810/acre). $ 11 <br />c) Buffer, 39 acres $0 <br />Total... $ 19 <br />