My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP31858
DRMS
>
Back File Migration
>
Report
>
REP31858
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:07 AM
Creation date
11/27/2007 6:03:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
7/14/1993
Doc Name
BATTLE MOUNTAIN RESOURCES INC-SAN LUIS PROJECT-SYNTHETIC LINER INSTALLATION-TECHNICAL SPECIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' the Contractor from full responsibility to furnish and install materials in confomtance with these <br />' Specifications. <br />3.5 Alteration to Drawings and Specifications <br />All alterations made to either the Specifications or Drawings shall be subject to the Design <br />Engineer's approval and, where applicable, to the approval of regulatory government agencies. <br />All alterations shall be issued under a covering work order signed by the Design Engineer. <br />4.0 SYNTHETIC MATERIAL <br />' 4.1 Scope <br />The Contractor shall furnish and install synthetic materials, all very low density polyethylene <br />(VLDPE), and miscellaneous materials incident thereto in accordance with the manufacturer's <br />' recommendations. Alignments, lengths, and areas are shown on or derived from the Drawings. <br />Exact locations and lengths may be varied to suit conditions encountered itt the field, as <br />approved by the Quality Assurance Engineer. <br />Synthetic liner material to be installed for the project shall consist of a 40-mil WLDPE liner. <br />4.2 Synthetic Liner <br />' 4.2.1 Scone <br />The Contractor shall furnish and install synthetic liner and miscellaneous materials incident <br />thereto as specified herein and in accordance with the manufacturer's recommendations. <br />Installation includes excavation and baclcfilling of synthetic liner anchor trenches as required. <br />' Exact locations and lengths may be varied to suit conditions encountered in the field, as <br />approved by the Quality Assurance Engineer. <br />4.2.2 General <br />The liner shall consist of a 40-mil very low density polyethylene (VLDPE) liner. The Conttactor <br />shall comply with the manufacturer's specifications concerning all aspects of shipping, storage, <br />installation, seaming, and seating of the liner. The liner shall be shipped to the site in cartons <br />containing folded, prefabricated panels or rolls of the synthetic liner. Storage and handling <br />' -s- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.