My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP27297
DRMS
>
Back File Migration
>
Report
>
REP27297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:58:15 PM
Creation date
11/27/2007 4:43:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Report
Doc Date
12/6/1995
Doc Name
1995 ANNUAL RECLAMATION REPORT
From
PACIFIC BASIN RESOURCES
To
DMG
Permit Index Doc Type
ANNUAL RECLAMATION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Anthony J. Waldron December 1, 1995 <br />Re: 1995 Annual Reclamation Report <br />However, the outslope below the Bear Creek stream <br />channel repair work, and the Lower Hubbard Creek Fan <br />Site, excluding the parking area, were seeded with a <br />temporary seed mix and mulched. <br />Seed was hand broadcast at approximately 40 pounds per <br />acre. Oat and alfalfa hay mulch was hand spread to <br />cover the area at approximately 3.5 tons per acre. The <br />seed mix consisted of the following: <br />Western Wheatgrass @ 41.7% = 16.7 pounds per acre <br />Slender Wheatgrass @ 20.8% = 8.3 pounds per acre <br />Indian Ricegrass @ 16.7% = 6.7 pounds per acre <br />Mountain Brome @ 20.8% = 8.3 pounds per acre <br />The outslope below the Bear Creek stream channel repair <br />was seeded and mulched the week of October 25 to <br />November 1. Actual acreage seeded and mulched is the <br />same as the area backfilled and graded to possible <br />final reclamation contours, depending on any further <br />changes resulting from a Board Hearing decision, <br />approximately 0.25 acres. <br />Lower Hubbard Creek Site was seeded and mulched the <br />week of September 11 to 15. By October 26, during an <br />inspection of the site by DMG, oats from the mulch and <br />some grass seed had germinated following an early snow <br />storm the previous weekend. The oats will form a cover <br />crop for the grasses during the first year. <br />Timing and results at the Lower Hubbard Creek Site are <br />similar to the experience with the topsoil pile at <br />Substation Number 3 in 1994. Depending on the success <br />of the temporary seeding, the site will either be <br />disced and reseeded, or interseeded with the final seed <br />mix in the fall of 1996, following completion of <br />backfilling and grading at the Hoist Site and approval <br />of a final reclamation plan. Actual area seeded at the <br />Lower Hubbard Creek Fan Site was approximately 1.25 <br />acres. <br />(f) Acres Previously Revegetated: <br />Area Acres Year <br />B-4 Degas Hole 0.04 1990 <br />B-5 Degas Hole 0.25 1990 <br />B-7 Degas Hole 0.70 1987 <br />B-8 Degas Hole 0.16 1987 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.