Laserfiche WebLink
<br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />March 2004 Monthly Report <br />Page 2 <br />During March, the West Pit water treatment plant operated efficiently discharging a total <br />of 9,794,100 gallons (30.06 acre-feet) of water to Rito Seco Creek and a total of 899,200 <br />gallons (2.76 acre-feet) of water was transferred from the water treatment plant to the <br />tailing impoundment. Seepage along Rito Seco Creek remained dry during the month. <br />The monthly precipitation accumulation for March was 0.45 inches, with the largest <br />accumulation occurring on March 4th (0.20"). <br />Table 1-March 2004 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitorin Site Date De th to Water feet <br />M-4R 3/31 /04 44.60 <br />M-6 3/31/04 Dry <br />M_7 3/31/04 Dry <br />M_g 3/31 /04 Dry <br />M-9 3/31 /04 141.82 <br />M-10 3/31/04 25.37 <br />M-11 R 3/3 ] /04 42.78 <br />M-12 3/31/04 179.36 <br />M-13R 3/31/04 132.68 <br />M-14 3/31/04 136.17 <br />M-15 3/31/04 82.70 <br />M-16 3/31/04 23.54 <br />M-19 3/31/04 24.26 <br />M-21 3/31 /04 17.97 <br />M-22 3/31 /04 16.65 <br />M-26 3/31/04 16.59 <br />M-32 3/31/04 41.82 <br />M-33 3/31/04 46.24 <br />M-34 3/31/04 23.00 <br />BF-4 3/31/04 24.98 <br />BF-6 3/31/04 30.74 <br />LS-1 3/29/04 Dr <br />LS-2 3/29/04 Dry <br />LS-3 3/29/04 Dr <br />LD-1 3/29/04 DrY <br />LD-2 3/29/04 Dr <br />LD-3 3/29/04 Dr <br />