Laserfiche WebLink
r <br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />March 2004 Monthly Report <br />Page 3 <br />Table 2 -March 2004 Tailing Disposal Area Piezometer Depth to Water <br />Measurements <br />Piezometer Date Depth to <br />Water feet Total Depth <br />D Volume of <br />Water ft <br />P6 3/30/04 Dr 72.46 0.00 <br />P7 3/30/04 Dry 92.50 0.00 <br />P8 3/30/04 96.68 97.51 0.83 <br />P9 3/30/04 71.72 72.30 0.58 <br />P10 3/30/04 58.01 58.30 0.29 <br />P11 3/30/04 41.22 41.80 0.58 <br />P12 3/30/04 41.65 41.71 0.06 <br />P13 3/30/04 40.97 41.34 0.37 <br />P14 3/30/04 Dr 41.24 0.00 <br />P15 3/30/04 Dry 41.10 0.00 <br />Through the end of February 2004 no water treatment plant sludge has been managed for <br />calendar year 2004. <br />Demolition of the San Luis mill facility continued during March, much of the mills east <br />wall has been removed in order to extract the ball and sag mills. <br />Should you have any questions or comments, please do not hesitate to contact either <br />myself (719) 379-0799 or Mr. Bill Lyle (303) 837-5852. <br />ncerel ,~ <br />ulio F. Madrid <br />nvironmental Coordinator III <br />Cc: Bill Lyle <br />file <br />