My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP27193
DRMS
>
Back File Migration
>
Report
>
REP27193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:58:10 PM
Creation date
11/27/2007 4:41:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
4/12/2004
Doc Name
March 2004 Monthly Report
From
Battle Mountain Resources Inc
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br />April 5, 2004 <br />Mr. Jim Dillie <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />R~G~ <br />APR i ~ 2Qua <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />March 2004 Monthly Report <br />Dear Mr. Dillie: <br />Division o1 Mlf;erals & GesIsOY <br />The following summarizes monitoring and site activities at the Battle Mountain <br />Resources Inc. (BMRI), San Luis Project for the month of Mazch 2004. <br />Surface and ground water monitoring and analysis were completed for all required sites <br />during the month per the terms and conditions of the TR-32 Quality Assurance and <br />Quality Control (QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on March 29`h, no water was present for <br />sampling and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment <br />piezometers, the Wesi Pit and the tailing embankment monitoring wells on March 30`s. <br />The March 30`h tailing impoundment piezometer measurements identified these <br />installations were either dry or contained less than 12 inches of water as illustrated in <br />Table Z. Tables 1 and 2 below identify the depth to water measurements collected for <br />each of the site monitoring wells, piezometers and lysimeters as required by the terms <br />and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently <br />during the month to minimize the collection pond level. The leak detection system was <br />measured on March 29`h. The Mazch tailings pond underdrain flow average was 51.32 <br />gpm and a total of 520 gallons of water was excavated from the leak detection system <br />yielding a monthly average of 17.33 gpad. <br />P.O. Box 310 San Luis, Colorado 81152-0310 (719) 379-0798 Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.