• Anew cavity will only be drilled in 1998, if any of the current cavities fail or become <br />contaminated with chlorides. An additional cavity would be an extension of cavity #2 to the <br />south or cavity #4 expanded to the north or south. No recompletion work is planned for <br />1988. During 1988, there are no plans for major rework activity on the existing wells. <br />Cavity #1 A will inject at the 130 foot lease boundary when put into service. Replacement or <br />service of submersible pumps will be performed as needed. All current recovery wells <br />were directional drilled, therefore no sonar surveys are planned in 1998. <br />4.0 1997 PROJECT ACTIVITIES <br />4.1 On-Site Facilities and Process Description <br />• 4.1.1 General Arrangement <br />Figure 2-1 illustrates location of project leases, mining panel #1, monitoring wells, access road <br />and associated utility lines. <br />4.1.2 Plant Modifications <br />Major plant modifications in 1997 included the addition of a second rental bailer which was <br />consolidated with the first to increase mine injection temperature. A fifth screen deck was <br />added to the screening facility to handle the increased plant throughput. Anew metal detector <br />and two new magnets were added to the packaging facility to improve quality control. <br />• 10 <br />