Laserfiche WebLink
<br />The following table summarizes sodium bicarbonate produced by WRN 1991 -1997: <br /> Cavity #1 Cavity #2 Cavity #3 Cavity #3A Cavity #4 <br />Tons Produced in 16,160 13,342 39,546 <br />1997 <br />Total Production 55,675 54,784 49,433 13,343 109,969 <br />1991 - 1997 <br />k. Following a roof collapse around the recovery well for cavity #2A (WRN 2A-2V), a <br />liner/screen was installed to establish flow to this well. <br />3.2.3 Proposed 1998 Activities and Schedule <br />• Processing <br />WRN anticipates production of approximately 80,000 tons in 1998 from cavities #1A, 3A, <br />and 4. A constant production schedule is planned. "De-bottle-necking" and efficiency <br />projects will more fully utilize the 125,000 TPY plant capacity and reduce production costs. <br />Major plant expansion design plans will be evaluated in 1998. <br />Wellfield <br />Completion of cavity #1 injection well 1A-4H1 will be performed in early 1998. Pipelines, <br />electrical power lines and production equipment will be installed to the injection well and <br />recovery well 1A-5HR in the first quarter of 1998. <br />CJ <br />9 <br />