Laserfiche WebLink
SNOWCAP COAL COMPANY <br />Cameo Refuse Disposal Area No. 1 Inspection - 4`" Quarter 2002 <br />On December 4, 2002, I performed the required quarterly visual inspection of the <br />Cameo Refuse Disposal Area No. 1 in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. There was no activity at the pile during the quarter. <br />The pile was dry. The south under drain was damp to dry. No other seepage was <br />noted around the pile. <br />The access road to the pile, which is the west extension of Haul Road No. 5, remains <br />open to accept coal and refuse material from other reclamation activities. <br />The northwest and southeast collection ditches were clear. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the haul road and sediment pond located below the pile. However, <br />a failure of the pile would probably not be a hazard to human life. <br />I certify that to the best of my knowledge and belief, that the fill and other aspects of the <br />Cameo No. 1 refuse pile have been constructed as permitted in the design approved by <br />the DMG. os®p°~ ~°~ <br />RF^ <br />P9 as,~,, S~~ <br />g~Cg~.• S t. ~ T/` tiy~a <br />Recommended maintenance: None -~~//°, ;'~``/i!//_/TJJ' ' ~'~ ~ <br />19. <br />My.]>> <br />1Oa <br />