Laserfiche WebLink
<br /> NCIG - 1991 HYDROLOGY REPORT <br />' 2.2 Discussion of the Data <br /> Data collected during the fall and winter quarters is consistent <br />' with previously collected data for those monitoring sites listed <br /> above. As previously reported, wells OW-3L, 7, 12, and 13 remain <br />' dry. <br />' ' Hydrographs for OW-8, and 19 are included. Water levels measured <br /> throughout the 1991 season are consistent with previous trends <br />' noted on th e hydrogra phs. <br />' The annual chemical analyses appear to be consistent with <br /> previously collected data. <br />2.3 Future Plans <br />The present quarterly/annual monitoring schedule will continue <br />' until activity resumes at the NCIG facility. As stated in previous <br />hydrologic reports, several plans will be implemented in order to <br />' maintain the quality and reliability of the collected data. The <br />destruction of OW-9L was discussed in the 1990 NCIG Permit Revision <br />and the well is to be replaced by an additional well downgradient <br />of the sediment pond (Pond A), prior to any activity on the site. <br />1 <br /> <br /> <br />Adrian Brosrn Consultants -3- Ref:1145/920114MG.HYD <br />1 <br /> <br />