Laserfiche WebLink
i' <br />~~ <br />^ <br />NCIG - 1991 HYDROLOGY REPORT <br />3.0 PROJECT WATER BALANCE <br />3.1 Vulcan Ditch <br />Flow in the Vulcan Ditch began in May, 1991 and continued through <br />October, 1991. Since the mine operation was suspended throughout <br />1991, all water diverted by the Vulcan Ditch was used exclusively <br />for agricultural purposes. Diversions to the ditch were as listed <br />below: <br />May - October, 1990: <br />1,195 AC-Ft <br />Total: 1,195 Ac-Ft <br />3.2 Agricultural IIses <br />As stated above, all diversions from the Vulcan Ditch during 1991 <br />were for agricultural purposes. <br />3.3 Mine IIsea <br />The Coal Ridge Number 1 Mine did not use any water during 1991 <br />since operations were in temporary suspension. No discharges were <br />made by the mine during this time period. <br />Adrian Brown Consultants -4- Ref:1145/920114MG.HYD <br />